Tracy Fire Station

Public/Government

74_5483e331a9bace540b3a2478fc014e25_s
102_75b44b0e9c2e5d305fa323c6c51d3476_s
103_aaa036e4cb16038f90e128d8e39c714f_s

Foundation System

Geologic Hazard(s)

Soft/Loose Soil

Liquefaction

Location

Tracy, CA

Owner

City of Tracy

Geotechnical Engineer

Structural Engineer

General Contractor

Project Summary

This site in Tracy has alluvium and loose sand at depth that could cause settlement of the new fire station.  The California Division of State Architect required the project to be on piles as the fire station is an essential service facility.  Farrell provided the solution using the Drill Displacement Pile (DDP) system.  The 18” diameter DDP were installed to depths of 38 to 40 feet.  This project was on a fast track with design completed within 2 weeks of authorization and 3 weeks of construction shortly after that.  Farrell collaborated with the engineers to provide a solution that met the stringent DSA review.